Project Type
Project Location
Boughton Monchelsea, Maidstone
This project was spread out over a couple of years manly due to Covid-19, with the garage being build first and then the summer house.
The property already had a 3-phase supply and we were able to run a sub-mains to the new summer house and install a 3 phase distribution which supplied the summer house and was ready for a 22KW electric vehicle charging point. In the summer house we installed a colour changing LED strip above the hot tub hidden behind a pelmet. The exterior of the house and drive was lit using Collingwood Lighting luminaires