One of a long-standing client were expanding their business and taking over the next-door office space to make a new workshop and boardroom.
We replaced the existing distribution board updating it to the latest regulation and installed dado trunking for power. The lighting required some creative thinking as the ceiling could not be fixed too, so metal Unistrut was used in the workshop and wooden beams were installed in the boardroom matching the existing structure so the new energy efficient LED lighting could be installed. We also installed a new BS 5839 pt1 fire alarm system throughout both units.