CCI - Underriver (July 2017)

One of a long-standing client were expanding their business and taking over the next-door office space to make a new workshop and boardroom.

We replaced the existing distribution board updating it to the latest regulation and installed dado trunking for power. The lighting required some creative thinking as the ceiling could not be fixed too, so metal Unistrut was used in the workshop and wooden beams were installed in the boardroom matching the existing structure so the new energy efficient LED lighting could be installed. We also installed a new BS 5839 pt1 fire alarm system throughout both units.

 

Great work and service

As always Ian's work and service was the best. He was helpful, gave us some good options to consider and was very accommodating when we kept changing our minds. He is thoroughly recommended.

— Mr Notman (25/08/2017)

Our Case Studies

Hythe
New power and lighting spray booth
CCI - Underriver
Office rewiring
Sturry
Rewire 2 flats
Boughton Monchelsea
Replace down lights
Barming, Maidstone
House rewire